+ Chandeliers Wall Fixtures Pendants Fans Bathroom Outdoor Directional Lights Other Categories Shop By Brand Candle Chandeliers Chandelier Accessories Down Chandeliers Other Chandeliers Ring Chandeliers Up Chandeliers Sconces Other Wall Lights Outdoor Wall Lights Picture Display Lights Sconce Accessories Wall Sconces Candle Pendants Down Pendants Linear Pendants Multi Light Pendants Outdoor Pendants Up Pendants Belt Fans Ceiling Fans Ceiling Fans with Light Dual Motor Fans Fan Motor Without Blades Fandeliers Huggers Other Fans Outdoor Fans Portable Fans Wall Fans Bathroom Fixtures Bath Fans Bathroom Sconces Other Bathroom Fixtures Vanity Lights Address Numbers Bollards Deck Lights Door Bells Exterior Accessories Exterior Chandeliers Exterior Fans Exterior Flush Mounts Exterior Foyer / Hall Lanterns Exterior Pendants Exterior Semi-Flush Mounts Hanging Lanterns Mail Boxes Marine Lights Other Exterior Pier Mount Lights Pier Mounts Portable Lanterns Post Adaptors Post Mount Lights Posts Sconces Solar Lights Wall Lanterns Wall Lights Wind Chimes Directional Flush Mounts Directional Island Lights Directional Light Accessories Directional Light Sconces Directional Recessed Lights Directional Semi-Flush Mounts Directional Spot Lights Directional Wall Lights Mono Points Other Directional Lights Outdoor Directional Lights Marine Lights Puck Lights Security Lights Replacement Glass Mirrors Other Decor / Home Accents Door Bells Wind Chimes AFX Lighting, Inc. ASD Lighting Access Acclaim Lighting Aladdin Light Lift Alloy LED Alora Lighting American Lighting Artcraft Arteriors Home Austin Allen & Co. Avenue Lighting Beacon Lighting America Bulbrite CAL Lighting CWI Lighting Capital Casablanca Fan Company Classic Corbett Craftmade Crystorama Currey Cyan Designs Diode Led ENVISION LED LIGHTING INC ET2 Eglo Elegant Elite Lighting Emery Allen Eurofase Fanimation Framburg Fredrick Ramond Generation Lighting Genie House Golden Hammerton Hi-Lite MFG Co. Hinkley House of Troy Hubbardton Forge Hudson Valley Infratech Innovations Lighting Justice Design Group Kalco Kalco Allegri Kichler Koncept Inc Kuzco Lighting Inc LNC Home Lark Legrand Lighting One US Lighting Specialist Lithonia Lighting Livex Lighting Matteo Lighting Matthews Fan Company Maxim Meyda Green Millennium Minka George Kovacs Minka Metropolitan Minka-Aire Minka-Lavery Mitzi by Hudson Valley Lighting Modern Forms US - Fans Only Modern Forms US Online Nora Nuvo Oxygen PLC Lighting Palecek Progress Quoizel Quorum Regina Andrew Robert Abbey Satco Products Inc. Savoy House Savoy House Meridian Sonneman The Coppersmith Toltec Company Troy Uttermost Varaluz Vaxcel International Visual Comfort & Co. Architectural Collection Visual Comfort & Co. Fan Collection Visual Comfort & Co. Modern Collection Visual Comfort & Co. Studio Collection WAC US Wind River Z-Lite
Hi, Sign In | Create Account Locations & Hours
Account Edit Account Account Information Default Billing Default Delivery User Name & Password Contacts Wishlists
+ Create A New Wishlist
Home About Us Contact Us Ideas & Advice Policies Shipping Policy Privacy Policy Return Policy Terms & Conditions Copyright @ 2025 Lighting Specialists. All rights reserved.
No Image
Available
Pre-Bent S Curve MonoRail
Image may not reflect selected features
Pre-Bent S Curve MonoRail (9ZLVU)
BROWN MO HORIZ. S-CURVE ANT.B
Product Specification
Item #
9ZLVU
Dimensions
Height: 0.60"
Width: 0.30"
Additional product details
Internal #
9ZLVU
Category
Track Ltg.
Subcategory
Track Accessories
Finish
Bronze
Style
Contemporary
Option
Title 20
Category
Monorail Hardware
Finish
Antique Bronze
Style
Contemporary | Modern
Option
Dry Rated
Bulb Dimmable
False
Introduction Date
01/01/2005
Ship Carton Height
6.00
Ship Weight
3
Special Features
From the brand formerly known as Tech Lighting
Vendor Ship Method
UPS Fedex
Warranty
1 Year
Weight
1.10
24 Volt
False
Adjustable Head
False
Cable Field Cuttable
True
Cannot Ship To California
False
Cannot Ship To Canada
False
Damp Rated
False
Dark Sky
False
Dry Rated
False
FWC Compliant
False
Integrated LED
False
Item Color 1
Brown
Master Color
Brown
Motion Sensor Included
False
Photocell Included
False
Replaceable Lamp
False
Reversible
False
Safety Rating
ETL
Shape
Pre-bent S-curve
Sloped Ceiling Compatible
False
Solar Powered
False
SORAA
False
Stocking Type
Made to Order
System
MonoRail
Title 20
False
Title 24
False
Transformer Required
False
Warm Color Dimming
FALSE
WET IP65
False
Wet Rated
False
Finish
Additional options that would change other selections
Item Color 1
Additional options that would change other selections
Master Color
Additional options that would change other selections
Call for Price
Qty:
BASE PRICE:
$
325
99
/ / 1
($325.99 / 1)
Add To Cart
Add To Estimate
Add To Wishlist
Save To Compare
Availability:
  • Manufacturer Availability Unknown
Similar Products View all
Matched by: